Many people think that tiling is only something that decorators know about, but don’t you know that if we understand the steps and precautions for tiling, we can effectively make the master cut corners, so today our topic is Let’s learn about the steps and precautions for laying ceramic tiles!
1. Steps of laying ceramic tiles
1. Add ceramic clay to clean water (water-cement ratio is 1:4). It is recommended to use mechanical mixing for better results. Let it sit for 5-10 minutes to mature before use. Stir it before use to increase the strength.
2. Use a trowel to apply the glue on the base surface so that it is evenly distributed into a tooth shape.
3. Knead the back of the brick directly onto the base surface. For stones with deeper grooves or heavier stones on the back of the brick, in addition to touching the glue on the base surface, you should also touch the glue on the back of the brick.
4. Position the tiles to keep them flat and aligned. The position of the tiles can be adjusted within 20 minutes after the tile adhesive is applied to improve project efficiency.
5. Preliminarily check whether the brick surface is flat and aligned, and whether the brick joints are clean and free of debris.
Note: Before the tile cement has initially set and dried (within about 4 hours after construction), it is advisable to clean the excess part of the tile surface with a damp cloth, and be careful not to expose it to rain. If it exceeds 24 hours, it can be cleaned with tile cleaner.
6. Caulking of ceramic tiles.
7. Wait for at least 15 minutes and clean the excess tile adhesive with a damp cloth.
8. After waiting for 24 hours, you can use tile cleaner to clean the tiles thoroughly.
2. Things to note when laying ceramic tiles
1. Wall base treatment
Especially if the balcony is insulated or whitewashed, it must be cleaned to expose the original cement base surface before paving. Generally, before laying ceramic tiles on the wall, you need to apply a layer of wall solid, sprinkle some water on the ground, and then lay the ceramic tiles. This will reduce the possibility of hollowing out of the ceramic tiles later.
2. Pre-paving
Especially for ceramic tiles that require a certain shape, such as waveguide lines, parquet, etc., pre-laying will avoid positional inaccuracies and avoid incomplete tiles appearing in conspicuous positions, affecting the overall effect.
3. Leave seams
Regardless of whether there are beautiful seams or not, certain gaps need to be reserved between the tiles, especially in areas like balconies that are easily accessible to large temperature changes. Leaving seams can reduce the possibility of extrusion and hollowing.able.
4. Soak in water
There is no doubt that ceramic tiles should be soaked in water before being laid, but special attention may not be paid to non-whole tiles when they are laid. They may be soaked in water before being laid or may have dried up after being soaked in water.
5. Ceramic tile adhesive
In places where the wall surface for tile laying is not particularly smooth, and where the cement is relatively thin, tile adhesive can be considered instead of cement.
6. After construction
Try not to step on the tiles prematurely after they are laid. Generally, it must wait 48 hours before people can install them. Otherwise, the auxiliary materials for laying the tiles have not dried and solidified, and the tiles are prone to unevenness.
The above content is the content of the article that the editor shared with you today about Steps and precautions for installing ceramic tiles. There is a lot of text, hahahaha, so let’s take a closer look! That’s it for today’s content sharing. I hope it can be helpful to you!